The erection of the log house

Before the erection of the log house on the territory of the customer, the client can examine the house in order to prevent possible problems and to estimate the quality of the joints and other elements of the log house that will be erected on his plot in several days.

At the place of the erection of the house the concrete basement is installated. During the erection the electroinstallation tubes have been conducted through the outlets. The erection of a large log house takes several days, the smaller ones-during a day. The workings according to the volume of the order follow then.

According to the volume of the order roof coatings are made depending on the client's choice (we propose a traditional "shindel" roof, made from the timber having the shape of the tile). We have also produced windows, doors and other joiner's elements.